After issuance: download the issued permit, submit final documents, and request closeout
Use this guide after a permit is issued to download or print the issued permit, submit final and as-built documents on the same record, and send a structured closeout request on that record. Staff read the same record and record each step in history.
Why this step exists
The pipeline in Permit lifecycle pipeline lists closeout as the last stage, with the next step to keep the issued permit, decision and final documents with the record number. No guide in the pack states how an applicant or contractor downloads the issued permit, which final documents to submit, or how to request closeout on the record. Without this step a contractor messages staff from outside the record and staff track the answer in a separate list. This guide states the download, the upload and the closeout request in one place, on the same record.
- Download and upload use the issued record you already have. This step creates no new record number and no new fee.
- The final documents list comes from the type page for your town. Where that list is not on the type page or the record, the information is unknown on this site.
- Where a fee amount, a due day count or a closeout date is not in a town document or on the record, read it as unknown on this site and ask the town office for the town document for the parcel.
- The structured closeout request in this guide replaces a free-text message as the closeout request, so staff receive the final documents checklist, the record check and the next step in one place on the record. A free-text message alone does not move the record to Closeout requested.
Before you start
Gather these before you open the issued record. You can save a closeout request as a draft in the same way as a draft application in Apply for a permit online.
- The record number for the issued permit, from the confirmation and from the record header
- A verified portal account linked to that record, see Create a portal account
- The final documents list on the type page for your town, with the accepted file types for each item
- Final and as-built files saved where you can find them, with clear names that match the description
- The closeout request checklist in the next section, with each final document type marked received on the current version
- A check of My records in the same workspace for an earlier closeout request for the same parcel and work. Where such a request exists, open that record instead of starting a second request for the same work
Steps
Work the steps in order on the same issued record. Check the workspace name before you start, because records belong to the selected workspace, as in Security.
1. Open the issued record
Sign in, check the workspace name in the app, open My records and open the issued permit by record number. Read the record header for type, status, parcel, applicant and next step, and read the timeline for the decision date and issued date where shown. Do not start a new application for this work.
2. Download or print the issued permit
Open the Documents tab on that record and open the issued permit document. Use the download or print control on that row where the screen shows one, and save or print the issued permit with the record number on it. Keep the issued permit with the record number for follow-up and for posting on site where the town asks for it. Where the screen shows no download or print control on the row, check the name, date and version on the row and ask the town office to check the file on the record.
3. Check the final documents list on the type page
Open the type page for the issued permit type and copy its final documents list. Do not guess the list from another type, another town or a prior record. Where the type page does not state a final documents list, write Unknown for that list and ask the town office for the town document for the record before you upload.
4. Upload final and as-built documents
On the same record, choose each final document type from the list, upload the file, add a short description that names the sheet or item it covers, and wait for the confirmation on the screen. See Upload plans and documents for file checks. Only the current version counts toward the item. Earlier versions stay readable and are never overwritten.
5. Preview or download and confirm received
Check that the list on the same record shows each final file as received, with its name, date and version. Open each file from the received row where the screen shows a preview or download control, and check that it opens and shows the correct sheet or content. Where no preview or download control is shown, check the name, date and version on the row and ask the town office to check the file on the record.
6. Send the structured closeout request on the same record
Open the closeout request on that same record and complete each field in the Data table below in order. Confirm the issued permit, check that each final document type shows as received on the current version, read the conditions, fees and inspections check on the record without entering a fee, date or code, and write one closeout statement with the record number, the issued date exactly as shown, each final document type with its version, and the exact next step you need. Submit once and wait for the confirmation and the history entry showing Closeout requested with user and time. The request is blocked while a required final document item still shows as missing. Do not start a second application and do not treat a message outside the record as the closeout request. Where the screen offers no closeout request control, write the same fields in the same order in Messages on that same record and ask staff to record the request in history, as in Respond to a correction letter.
7. Read the close on the same record
Open the record again and read the closed date, the final documents filed with record number, parcel and type, and the full history readable by parcel, as stated in Permits and plan review. Keep the record number, invoice number and case number where shown for follow-up. A draft is never counted as submitted and never creates a fee.
Structured closeout request on the same record
Use this request for every closeout after issuance, in place of a free-text message. The request lives on the issued record, uses the record number already assigned, and moves that record through the states in the next table. It adds no new record, no fee and no date.
- Complete the fields in the Data table below in order. A required field that is missing blocks the request and names the step and group that owns it, in the same way as the review page in Apply for a permit online.
- Read the conditions, fees and inspections check from the record. Do not enter a fee amount, a due date, a code section or a status on the request. Where a check item is not on the record, write Unknown for that item and name the field or document needed.
- Submit once. Wait for the confirmation with the record number and the history entry for Closeout requested before you act again. A second submit for the same work is a duplicate request, not a second closeout.
- Staff record closeout on the same record after checking final documents, fees, conditions and prerequisites listed on the record. A closeout request alone does not close the record.
Data the closeout asks for
Use only the fields in this table on the closeout request. Do not add a fee amount, a due date, a decision or a status to the request, each of those is read from the issued record that follows it.
| Field | Required | What to enter | Source after closeout |
|---|---|---|---|
| Record number | Yes, read from the record | Record number assigned once at submission and never reused, copied from the record header and shown on the request for staff to check | Record header on that record |
| Issued permit document | Yes, to confirm | Confirm the issued permit opened from the Documents tab on that record, with its name, date and version on the row, has been downloaded or printed | Issued permit document on that record |
| Final and as-built documents checklist | Yes, where the type page lists them | Each final document type from the type page, marked received on the current version with its name, date and version. The request is blocked while any required item still shows as missing | Received list on that record, with name, date and version |
| Conditions, fees and inspections check | Read from the record, not entered | Read each condition with its due date and status, the balance due on the invoice, and each inspection with its scheduled date, window and result, on that record. Do not enter a fee, date, code or status | Unknown: conditions.due_date not in supplied context, Unknown: invoices.balance_cents not in supplied context and Unknown: workflow_tasks.due_at not in supplied context, where the record does not state them. Ask the town office for the town document for the record |
| Closeout statement | Yes | One statement with the record number, the issued date exactly as shown, each final document type with its version, and the exact next step you need, such as closeout after final documents are received. Quote the comment number and sheet where closeout depends on a correction comment | History entry for Closeout requested on that record, with user and time |
| Contacts by role | Yes, at least one contact on the record | Name, email and phone for the applicant and for each role the form marks as required, already on the record | Contacts by role on that record |
| Fee lines, decision, closed date and due date | Not asked on the request | Do not enter a fee amount, a date or a status on the request | Unknown: fee_items.amount_cents not in supplied context and Unknown: workflow_tasks.due_at not in supplied context, where no town document states them. Fee lines are read on the invoice, and a closed date is read on the record after staff record closeout |
States, owners and dates on the closeout
Only one state is current at a time on one record. Earlier states stay readable, and the next step changes on the same record.
| State | Owner | Date field on the record | Next step in plain words |
|---|---|---|---|
| Issued | Department head or the assigned decision role for the type | Issued date where issued, read from the record | Download or print the issued permit and check the final documents list on the type page |
| Final documents received | Applicant or contractor, with staff where the type asks for review | Upload date of each final file, read from the received list | Send the structured closeout request on the same record with the record number and each final document type |
| Closeout requested | Permit technician | Request date, read from the history entry for the structured closeout request on the record, with user and time | Wait for staff to check final documents, fees, conditions and prerequisites on the record and record closeout. The timeline shows Closeout requested until staff record the next state |
| Closed | Permit technician | Closed date, read from the record | Keep the issued permit, decision and final documents with the record number, parcel and type |
- Every state change writes a history entry on the record with user and time, and the next step updates on the same record, in the same way as a status change in Permits and plan review.
- Where a date is not on the record, the record shows no date for that state. Do not use a date from another record, another town or an example.
- No closeout interval, window length or reminder timing is published on this site. Those items are town set and are shown on the record where the record states them.
What this step never does
Keep these limits in place when you set up the closeout in Setup, with the setup steps in Set up a permit type and fees.
- It never assigns a new record number. A record number is assigned once at submission and is never reused.
- It never creates a fee. A draft is never counted as submitted and never creates a fee, and a closeout request never creates a fee.
- It never appears in public search as a separate record. Public search shows only portal visible statuses and public fields for a submitted record, as in Search a public record.
- It never grants staff access. A portal account never grants staff access, and signing in alone does not add a PermitDesk role.
- It never replaces an inspection, a hearing, a correction resubmittal or a license renewal. Each of those uses its own guide and its own record.
- It never closes the record by itself. Staff record closeout on the same record after the final documents, fees, conditions and prerequisites check, and the request alone shows only Closeout requested.
Test the closeout before you publish it
Work through these steps in order on a clearly marked test record in the town workspace. Each step ends with what you should see when it worked.
Open a test issued record and leave the final list empty
Submit a test closeout with no final document. You should see the structured request blocked, the missing final document named in plain words, and no closed date assigned as a submitted record.
Download the test issued permit
Open the test issued permit from the Documents tab and use the download or print control where shown. You should see the issued permit with the test record number, and the test record stays private.
Upload a complete test final set
Upload each final document type from the type page with a description, then submit once. You should see each file as received on the same record, with name, date and version, and no fee created.
Send the structured closeout request on the same test record
Complete the closeout request on the test record with the record number, the issued date exactly as shown, and each final document type with its version. You should see one request on that one record, a history entry showing Closeout requested with user and time newest first, and the timeline showing Closeout requested until staff record closeout.
Publish only after the test passes
Run the safe defaults health check in the setup guide, then publish only after the test passes. See Set up a permit type and fees.
Permit lifecycle pipeline · Upload plans and documents · Apply for a permit online · Set up a permit type and fees
Download the issued permit and close the record
Open the issued record, download the issued permit, upload final documents, and send the structured closeout request on the same record.